樱花草在线社区www韩国_好姑娘免费观看高清电影_中文字幕有码无码av_硬了二十分钟没进去就软了_久久无码av三级_国产精品秘入口18禁麻豆免会员_午夜少妇偷人高潮a片_国产一女三男3p免费视频_最美情侣国语版免费观看高清

Welcome to Jiaozuo Libo Light Alloy Co., Ltd.

Aluminum alloy sacrificial anode

magnesium anode, zinc anode

Telephone:

0391-7588881 +8618739187123

Jiaozuo Libo Light Alloy Co., Ltd.

Industry News

Application of pipeline integrity management technology

  • Author:Libo
  • Source:wm.meronacollection.com
  • Date:2021-06-11
  • Click:0

On October 5, 2017, the stress monitoring data at 018km+299m of Zhongwu pipeline showed abnormal, exceeding 60% of the allowable value and issuing a yellow warning. According to the analysis of pipeline integrity management system based on GIS, the pipeline here crosses the green slope behind the 302 provincial highway and crosses the landslide. There are 11 households in the potential impact radius, and the landslide is located between two gullies. Through the exploration and analysis, a thought influenced by continuous heavy rains, increases in pipeline crossing the slope groundwater flow, slide body clay gravel filling water more severe, especially 302 provincial highway drainage due to landslides blocked, lead to the segment above road rain water directly into the landslide, the soil is in a state of full water for a long time, the mechanical strength is reduced, soil sliding. The landslide is composed of slope deposit and colluvial slope deposit, which is a soil landslide. The leading edge of the landslide is the 302 dart, and the crack is accompanied by "smoking" phenomenon, which is a typical cleaning, or a combination of the two, which is a sign of dangerous sliding of small volume and broken into blocks. The plane of the landslide body is irregular arc, and the sliding direction is about the direct removal of rock. For the large volume, support measures are taken. The east side is bounded by provincial highway 302, and the west side is at the foot of the slope. If the terrain is large and the dangerous rock mass is broken into blocks, it can be cleared first and then supported. The specific measure body is slow up and steep down, with a slope of about 35 ". The landslide is about 70m long from north to south.

There are: (1) there is a cavity of dangerous rock, and the volume is not large, directly set the support width of about 80m, the area of about 0.5×10'm2, the thickness of 20~5.0m, the volume of the column, resist the amount of dangerous rock period, control 6 dangerous rock. ② The dangerous rock footing is about 1.9×10 × m2. The buried depth of pipeline is 0.8~2.0m. Severe weathering, reinforced concrete or mortar masonry structure foot guard, stability calculation results show that the landslide weight + surface load to continue weathering, treatment of 9. (3) The volume of the dangerous rock is less than 500m2, and the stability coefficient is 1.003-1.079 under the condition of a rainstorm in consecutive +50 years, and 10 of them are treated by the qing method. (4) The volume of the dangerous rock is between 500 and 1000m2, and the relative capacity is in an understable or basically stable state. In order to ensure the safety of the pipeline, it should be easy to be broken. (5) Emergency rescue measures are taken at the bottom of the presser foot, the top of the joint filling and drainage, to ensure the integrity of the rock, medium volume, the use of wrong rod treatment 6. 6 finished pipes temporary security, dangerous rock is demonstrated, permanent measures, landslide is large (more than 1000 m), using the prestressed anchor cable fault overall safety coefficient increase to 1.15, take the top of the landslide and central solid governance 4 set to play in the drainage, part 11 root pile retaining wall of the bottom, (2) the passive protection of direct pipeline protection, The safety factor can be increased to the predetermined value by setting the reinforced concrete engineering treatment measures above the pipeline. Hard cover or set up stone block net, falling trough, control three dangerous rock mass. 2.2 Risk Analysis and Preventive Measures of Geological Disasters of Typical Dangerous Rock Collapse Zhangjiagou dangerous rock (group) is located at the source of Zhangjiagou slope (3) in Shizhu County, and the dangerous rock is developed in the upper Shaximiao group group of middle Zhuluo system.


Online
聯系方式

熱線電話

18739187123

上班時間

周一到周五

公司電話

0391-7588881

花房姑娘高清电视剧免费看| 精品女同一区二区三区在线| 特一级黄色毛片| 久久综合伊人77777| 国产一级黄色电影| 女教师淫辱人生小说| 精品黑人一区二区三区国语馆| chinese18hdsexvideos天美18| 主人私奴晨起伺候调教男男| 扒开美女内裤狂揉下部打扑克| 主人+调教+憋尿+高潮+锁小说| 大山深处的农妇肉体bbws| 丰满xxx| 五月婷视频| 国产色秀视频在线观看| 别cao我了~好爽~轻一点视频| 新婚之夜玷污岳丰满少妇在线观看| 免费黄色福利网站| 国产又粗又长又黄又爽视频| 抱进浴室边洗澡边做| 欧美一区二区三区爽爽爽| 亚洲女佣奶水挤奶喝奶| 扒开双腿疯狂进进出爽爽爽| 成年人免费看黄色片| 日本三级电视剧| 日韩理伦片在线观看视频播放| 三年片在线观看大全有哪些动漫| xxxxxl19成人免费视频| 日本成人黄色网址| 影音先锋在线视频| 伦亲女小芳全文阅读| 男人的天堂伊人网| 国产一区二区三区在线视频观看| 自拍偷在线精品自拍偷99九色| 欧美偷拍一区二区| 阿诺拉大尺度做爰未删减| 中日韩无砖码一线二线| 国产xxxx岁13xxxxhd| 久久国产区| 男ji大巴进入女人免费视频| 国产区在线观看视频|